Project - ERP Assessment Project
Lead the ERP Assessment project, with objective to determine benefit in replacing the existing local ERP solution (also used by another remote site), with a different ERP solution used throughout our European locations. I decided to also consider replacing all of the ERP's with a new one.I worked locally to document core departmental operations / procedures in Microsoft Visio. Then, working with department heads, I reviewed the working business processes (AP, AR, Production, Purchasing, Quality, Receiving, Sales Order Entry, and Shipping) at all the other locations by:
- creating a master process flow for each department based on the workflow at the local office
- training the department heads in Visio
- creating a group for each department
- providing each group with a version locked copy of my master process flow
- each goup used the Revise feature in Visio to edit in procedure changes as per their specific needs
- I then reviewed the differences and compiled a new global master document
I recommended that the company move to a single Tier 1 ERP solution in the future, and drafted long-term road maps outlining required changes (global standards for stock code structures, standardized G/L coding definitions, alignment of business processes, reporting requirements, etc.).